Many successfully completed projects across Egypt — From industrial facilities and structural modifications to restoration and finishing works.

Our Portfolio

Choose Your Category

All
All Projects
Industrial
Industrial Facilities
Isolation
Isolation Works
Repair
Repair Works
Structural
Structural & Finishing
Latest Work

All Projects

Project
Project
Project
Project
Project
Project
2023Industrial1/6

Oxygen Piping Line Sphinx Glass

Year: 2023
Location: Sphinx Glass Factory, Sadat City, Egypt

Implementing steel pipes to transport oxygen gas to the smelting furnace. The process includes implementing the structure that carries the pipes and creating a path through the production holds, warehouses, and over the roads. It also includes assembling in a way that ensures quiet flow and reduces losses and leakage.

Project
Project
Project
Project
Project
Project
Project
Project
2023Industrial1/8

Expansion And Rehabilitation Of The Quality Laboratory

Year: 2023
Location: Sphinx Glass, Sadat City, Egypt
Consultant: GM Engineering Consulting Office

Making an addition and expansion to the quality laboratory using a steel structure, finishing, re-dividing and rehabilitating the basic laboratory, adding annexes, toilets, and the central air conditioning network, while using the best materials and equipment.

Project
Project
Project
Project
Project
Project
Project
Project
Project
2023Isolation1/9

Anti-Static Epoxy Floor Layer Of Lithium Battery Factory

Year: 2023
Location: Chloride Egypt, Abu Rawash, Egypt.

Implementing a self-leveling epoxy floor layer on the old concrete floor, which includes preparing and maintaining the old concrete floor, fixing problems and defects, creating a drainage channel, and using highly efficient materials.

Project
Project
Project
Project
Project
Project
Project
Project
Project
2023Repair1/9

Reinforcing And Restoring The Foundations Of The Upper Water Tank

Year: 2023
Location: Sphinx Glass Factory, Sadat City, Egypt.
Consultant: GM Engineering

Reinforcing tank bases by making concrete tops, adding reinforcing mesh, and planting using highly efficient epoxy materials.

Project
Project
Project
Project
Project
Project
2022Structural1/6

Netherlands Embassy Wall

Year: 2022
Location: Embassy Of The Netherlands , Zamalek District - Cairo,Egypt.

Implementing a concrete wall resistant to shocks and explosions with distinctive architectural character using smooth-surfaced concrete (Fair Face).

Project
Project
Project
Project
Project
Project
Project
Project
2022Industrial1/8

Civil Works For The Plastic Injection Factory Chloride Egypt

Year: 2022
Location: Chloride Egypt ,6th Of October ,Egypt.

Implementation of civil works for the factory, including truss bases, industrial floors, drainage ducts, fire-face buildings, etc., on an area of ​​approximately 1,500 meters.

Project
Project
Project
2016Repair1/3

Repair Of Prado Factory Floors

Year: 2016
Location: Prado Carpets, Sadat City, Egypt.

A deep structural restoration of the industrial floors inside the Prado Carpet Factory in Sadat City, and repairing the defects resulting from the movement of equipment and loading vehicles.

Project
Project
Project
Project
2022Structural1/4

Development And Elevation Of A Residential Villa

Year: 2022
Location: Fifth District - Sadat City

Making substantial structural modifications, including expanding the area, increasing the built-up area, removing large quantities of the building, and working on removing a load-bearing beam from the middle of the hall, as well as working on building details inside and outside.

Project
Project
Project
Project
Project
Project
Project
Project
Project
Project
2022Repair1/10

Paint Belts, Towers And Industrial

Year: 2022
Location: Sphinx Glass, Sadat City ,Egypt.

Specialized industrial paints for steel parts to protect against corrosion, chemicals, humidity, and weather factors.

Project
Project
Project
Project
Project
Project
2021Repair1/6

Reinforcing The Steel Structure Of The Glass Container Factory

Year: 2021
Location: Middle East Glass Containers, Sadat City ,Egypt.

Implementing a very complex structural reinforcement process for the steel structure of the factory in a way that does not cause the production process to stop with extremely harsh working conditions, as the work is done above the main oven and at very high temperatures and amid the oven exhausts and fumes. It is also necessary to implement it according to the highest standards of engineering precision as well as taking all safety precautions. Occupational health and worker protection

Project
Project
Project
Project
Project
Project
2020Finishing1/6

Finishing The Facade Of A Residential Tower Owners Association Of Tower 18

Year: 2020
Location: Mansheyet El Bakry - Heliopolis Cairo, Egypt.

Finishing the facades of the tower using high-efficiency materials, with the implementation of a drainage network for air-conditioning devices.

Project
Project
Project
2020Industrial1/3

Flood Protection System

Year: 2020
Location: Sphinx Glass, Sadat City.

Design and implementation of a flood protection system at the entrances and doors of the Sphinx Factory and in front of vital facilities such as electrical rooms, transformers, etc.

Project
Project
Project
2021Repair1/3

Cooling Water Pipe Paints

Year: 2021
Location: Sphinx Glass, Sadat City ,Egypt.

The use of special paints to paint the cooling water pipes in the water station of the Sphinx Glass Factory, including sandblasting and treatment of leaks, and special paints to maintain the condition of the pipes, then paint with flexible epoxy materials to resist temperature changes.

Project
Project
Project
Project
Project
Project
2019Industrial1/6

Reinforcing The Bases Of The Lehr Furnaces

Year: 2019
Location: Sphinx Glass, Sadat City,Egypt.

Reinforcing the bases of the lehr furnaces, which are corroded as a result of shocks and thermal load, using metal sections and special concrete.

Project
Project
Project
Project
2019Industrial1/4

Shoring Strut For Blast Furnace Exhaust System

Year: 2019
Location: Sphinx Glass, Sadat City.

Implementation of special heat-resistant concrete up to 1100 degrees Celsius made of special refractory minerals.

Project
Project
Project
Project
Project
2019Industrial1/5

Civil Works For Production Plant

Year: 2019
Location: Production For Engineering Industries, Wadi Natrun,Egypt.

Implementation of the civil works of the factory, including the bases of the truss, the administrative building, the fence, and the service rooms, using concrete executed using the fire face.

Project
Project
Project
Project
2019Industrial1/4

Material Elevator Machine Base

Year: 2019
Location: Prima Ceramics, Sadat City.
Consultant: Dr. Ahmed Ragab

Concrete base for the raw materials elevator machine with precise dimensions, designed for high loads, implemented inside the factory during production.

Project
Project
Project
Project
Project
Project
2019Isolation1/6

Car Battery Crushing Plant

Year: 2019
Location: Chloride Egypt, Abu Rawash, Egypt.

Implementing chemical-resistant concrete floors, then applying U-crete, which has great resistance to acids. This is one of the requirements for dealing with the very strong sulfuric acid leaking from dead batteries. The process also includes implementing acid drainage ducts, an acid collection tank, and all supplies of highly resistant materials such as Teflon, Stainless steel 316L, GRP material.

Project
Project
Project
Project
Project
Project
Project
Project
Project
Project
Project
Project
Project
Project
Project
2020Repair1/16

Repair And Strengthening Of The Columns Supporting The Main Melting Furnace

Year: 2020
Location: Sphinx Glass, Sadat City,Egypt.

The occurrence of a large fire caused severe damage to the concrete columns supporting the main melting furnace, which necessitated the implementation of steel and concrete jackets for reinforcement with the use of highly durable materials and the implementation of the process within a very compressed time schedule and in a manner that does not interfere with the work of the rest of the factory parts and does not stop the production process.

Project
Project
Project
Project
Project
Project
Project
2019Repair1/7

Painting Glass Melting Furnace Tempering Pipes

Year: 2019
Location: Sphinx Glass, Sadat City ,Egypt.

Painting the melting furnace cooling pipes using special heat-resistant epoxy materials and carrying out the work during extremely difficult working conditions due to high temperature and limited space in a way that does not cause a stop or breakdown in production.

Project
Project
Project
Project
Project
Project
Project
Project
Project
Project
2019Repair1/10

Reinforcing An Archaeological Building

Year: 2019
Location: Baba Abdo Restaurant, Elsayda Zeinab - Cairo,Egypt.
Consultant: Dr. Ahmed Ragab

Reinforcing the roof of a restaurant located inside an archaeological building using steel sections without affecting the character or shape of the stone building.

Project
Project
Project
Project
Project
Project
Project
Project
Project
2019Repair1/9

Repair Of A Residential Building

Year: 2019
Location: Al-Hajj : Ahmed Antar Sadat City ,Egypt.

Restoration and rehabilitation of a residential building due to the influence of weather factors on it, which required making steel and concrete coverings for the bases and columns, creating load-bearing beams for the roofs, and restoring concrete roofs.

Project
Project
Project
Project
Project
Project
Project
2019Repair1/7

Painting The Upper Water Tank

Year: 2019
Location: Sphinx Glass, Sadat City ,Egypt.

Sandblasting and painting the steel structure of the upper water tank and diesel tanks at a height of 45 meters using special epoxy paints, in addition to drawing the company’s logo on top of the tank using manual means and with the help of specialized technicians.

Project
Project
Project
Project
Project
Project
Project
Project
Project
Project
Project
Project
Project
Project
2019Structural1/14

Fire Water Valve Rooms Inside The Sphinx Glass Factory

Year: 2019
Location: Sadat City - Menoufia.

Implementing modifications and adding valves on lines for water fire with diameters of (8, 10, and 12), along with creating buried concrete rooms inside them, re-leveling the asphalt road.

Project
Project
Project
Project
Project
Project
Project
Project
Project
2018Industrial1/9

Expert Villas - ELmaghraby Farm

Year: 2018
Location: Agricultural mafa, Nubaria,Egypt.

Implementation of hotel villas within the Moroccan farm, including construction works, finishing and general site coordination bases.

Project
Project
Project
Project
2018Isolation1/4

Epoxy Floors

Year: 2018
Location: Epic for pasteurized eggs, Sadat City, Egypt.

Implementation of self-leveling epoxy floors, resistant to bacteria and fungus, for raw egg stores in the company's factory.

Project
Project
Project
Project
Project
Project
2019Repair1/6

Painting The Diesel Tank

Year: 2019
Location: Sphinx Glass, Sadat City ,Egypt.

Sandblasting and painting the steel diesel tank are done with specialized epoxy paints, while all procedures carefully address fire hazards using dedicated equipment and materials.

Project
Project
Project
Project
Project
Project
Project
Project
Project
Project
2018Repair1/10

Repair Of Battery Charging Area Tunnels

Year: 2018
Location: Chloride Egypt, Sixth Of October,Egypt

Restoration and repair of tunnels and drainage channels under charging machines using special concrete and covering them with epoxy materials that are highly resistant to chemicals, with the use of 316 stainless steel frames, due to the structure being exposed to sulfuric acid in high concentrations as a side effect of the manufacture of car batteries.

Project
Project
Project
Project
Project
Project
Project
2018Structural1/7

Expansion And Elevation Of A Residential Villa

Year: 2018
Location: First District - Sadat City, Egypt.

Making substantial structural modifications, including increasing the built-up area of ​​the villa by creating bases, columns and beams and linking them to the main structure, adding balconies, creating roof rooms, removing beams from the ceiling of the hall and replacing them with lights, then re-finishing the villa from the inside and outside.

Project
Project
Project
Project
Project
Project
Project
2017Industrial1/7

Industrial Wastewater Treatment Plant

Year: 2017
Location: Aksa Dyeing, Burj Al Arab,Egypt.

A multi-stage compact industrial sewage plant with a complex concrete design to ensure a natural flow of treated water from one stage to another smoothly and automatically. This required the implementation of many openings and pipes with very precise sizes and using special concrete and corrosion-resistant materials.

Project
Project
Project
2016Industrial1/3

Tunnels And Humidification Stations

Year: 2016
Location: Vortex Spinning, Sadat City.
Consultant: Kandil Consultants

The process of executing underground tunnels of reinforced concrete (fire face) with complex paths and capacities accurately calculated for humidification and internal weather control inside the production halls.

Project
Project
Project
Project
Project
Project
2016Industrial1/6

Carpet Machinery Bases

Year: 2016
Location: Prado Carpets, Sadat City.

Implementation of concrete bases for carpet weaving machines with a fixed weight of 37 tons. The bases contain a maintenance tunnel and vibration-absorbing bases.

Project
Project
Project
Project
Project
Project
2016Industrial1/6

An Administrative Building Inside The Prado Carpet Factory

Year: 2016
Location: Prado Carpets, Sadat City.

Implementation of an administrative building inside the factory with the implementation of layers of noise-resistant insulation to isolate the administrative offices from the noise of the machines.

Project
Project
Project
Project
Project
Project
Project
2018Repair1/7

Painting Gas Pipes

Year: 2018
Location: Sphinx Glass, Sadat City,Egypt.

Painting pipes for nitrogen, hydrogen and natural gas gases using special materials that are resistant to large differences in temperature from 50 degrees below zero to 50 degrees above zero.

Project
Project
Project
Project
Project
Project
2015Industrial1/6

Industrial Wastewater Treatment Plant

Year: 2015
Location: 10th Of Ramadan, Egypt.

An integrated industrial wastewater treatment plant containing a main aeration tank with a capacity of 6,000 cubic meters and multi-stage treatment tanks made of reinforced concrete with special sectors and specifications.

Project
Project
Project
2015Industrial1/3

Qazman Factory

Year: 2015
Location: 10th Of Ramadan, Egypt.
Consultant: Kandil Consultants

One of the most complex and accurate projects of the company, where the factory halls were implemented from reinforced concrete formed on site, but with the same design and details of the prefabricated concrete sectors, which necessitated the application of the highest standards of quality, accuracy of sizes, and a large number of engineering details to comply with the rest of the prefabricated elements.

Project
Project
Project
2015Industrial1/3

Ready Mix Concrete Factories

Year: 2015
Location: Modern Concrete, Sadat City.
Consultant: Kandil Consultants

Implementing the concrete structure, loading ramps and tanks for ready-mix concrete plants.

Project
Project
Project
Project
2014Industrial1/4

Dakahlia Poultry Slaughterhouse

Year: 2014
Location: 10th Of Ramadan, Egypt.

Civil works for the automatic poultry slaughterhouse on an area of ​​approximately 15,000 square meters, including the administrative building, electricity buildings, pump rooms, transformer rooms, and other works.

Project
Project
Project
Project
2014Repair1/4

Repair And Rehabilitation Of A Poultry Farm

Year: 2014
Location: Dakahlia Poultry, Belbeis,Egypt.
Consultant: Dr. Al-Sayed Al-Qasabi

Deep structural consolidation and restoration of a six-storey poultry farm including column shirts, beam reinforcement, ceilings and walls.

42
Projects Listed
15+
Years Experience
5
Categories
11+
Trusted Clients

Have A Project In Mind?

Let our team of experts bring your vision to life with 15+ years of specialized contracting experience.