industrial facilites
Our Projects
Latest Work
Industrial wastewater treatment plant
P&J Juices , Sadat City,Egypt.
2023
Engineering consultant:Cairo Consult
Work Description:
Implementation of an integrated, buried station for industrial sewage treatment with a capacity of 3,500 m3 of treated and insulated reinforced concrete, including the implementation of openings, networks, etc., according to engineering plans.
Oxygen piping line Sphinx Glass
Sphinx Glass, Sadat City,Egypt.
2023
Work Description:
Implementing metal pipes to transport oxygen gas to the smelting furnace. The process includes implementing the structure that carries the pipes and creating a path through the production holds, warehouses, and over the roads. It also includes assembling in a way that ensures quiet flow and reduces losses and leakage.
Expansion and rehabilitation of the quality laboratory
Sphinx Glass ,Sadat City,Egypt
2023
GM Engineering Consulting Office
Work Description:
Making an addition and expansion to the quality laboratory using a metal structure, finishing, re-dividing and rehabilitating the basic laboratory, adding annexes, toilets, and the central air conditioning network, while using the best materials and equipment.
Fire water valve rooms inside the Sphinx Glass Factory
Sphinx Glass ,Sadat City,Egypt
2019
Work Description:
Implementing modifications and adding valves to HDPE fire water lines with diameters of 8, 10, and 12, along with creating buried concrete valve chambers, then re-adjusting and leveling the asphalt road.
Civil works for a production plant
Production for engineering industries, Wadi Natrun,Egypt.
2019
Work Description:
Implementation of the civil works of the factory, including the bases of the truss, the administrative building, the fence, and the service rooms, using concrete executed using the fire face
Material elevator machine base
Prima Ceramics, Sadat City,Egypt.
2019
Engineering consultant:Dr. Ahmed Ragab
Work Description:
Execution of a concrete base for the base of the raw materials elevator machine with precise dimensions and designed to withstand high loads and implemented inside the factory during the production process.
Industrial wastewater treatment plant
Aksa dyeing, Burj Al Arab,Egypt.
2017
Work Description:
A multi-stage compact industrial sewage plant with a complex concrete design to ensure a natural flow of treated water from one stage to another smoothly and automatically. This required the implementation of many openings and pipes with very precise sizes and using special concrete and corrosion-resistant materials.
Tunnels and humidification stations
Vortex Spinning & Weaving, Sadat City,Egypt.
2016
Engineering consultant : Kandil Engineering Consultants
Work Description:
The process of executing underground tunnels of reinforced concrete (fire face) with complex paths and capacities accurately calculated for humidification and internal weather control inside the production halls.
An administrative building inside the Prado Carpet Factory
Prado Egypt Carpets, Sadat City,Egypt.
2016
Work Description:
Implementation of an administrative building inside the factory with the implementation of layers of noise-resistant insulation to isolate the administrative offices from the noise of the machines
Industrial wastewater treatment plant
Dakahlia massacres, 10th of Ramadan,Egypt.
2015
Work Description:
An integrated industrial wastewater treatment plant containing a main aeration tank with a capacity of 6,000 cubic meters and multi-stage treatment tanks made of reinforced concrete with special sectors and specifications. Open in Google Translate • Feedback
Qazman Factory
Quzman Spinning & Weaving, 10th of Ramadan,Egypt.
2015
Engineering consultant : Kandil Engineering Consultants
Work Description:
One of the most complex and accurate projects of the company, where the factory halls were implemented from reinforced concrete formed on site, but with the same design and details of the prefabricated concrete sectors, which necessitated the application of the highest standards of quality, accuracy of sizes, and a large number of engineering details to comply with the rest of the prefabricated elements.
Dakahlia Poultry Slaughterhouse
Dakahlia massacres, 10th of Ramadan,Egypt.
2014
Work Description:
Civil works for the automatic poultry slaughterhouse on an area of approximately 15,000 square meters, including the administrative building, electricity buildings, pump rooms, transformer rooms, and other works.